How we work

Six steps, one team and one contract.

  1. 01

    Requirements

    We meet to understand your operation, schedule and budget.

  2. 02

    Site and feasibility

    We assess your site or help you find one that works.

  3. 03

    Design and budget

    We develop the design and agree scope, price and schedule.

  4. 04

    Permits

    We obtain the municipal permits and other approvals.

  5. 05

    Construction

    We build, with progress reports and site visits.

  6. 06

    Handover and after-sales

    We hand over the building ready for operation and remain available.

The stages of a build

On site

A building goes up in seven stages. Each one is checked before the next begins.

  1. 01

    Site set-up and preliminary works

    Before any earth is moved, the site is organised: hoarding, site office, temporary services and setting out the building on the plot.

    • Hoarding and site sign
    • Site office and temporary services
    • Site clearance
    • Setting out and levels
  2. 02

    Earthworks and foundations

    We excavate to design level and build the foundations specified by the soil survey.

    • Excavation and underpinning
    • Piles or pad footings
    • Pile caps and ground beams
    • Basements and waterproofing
  3. 03

    Concrete structure

    Columns, beams and slabs, floor by floor. Every pour is released only once the reinforcement is checked and the concrete tested.

    • Formwork and reinforcement
    • Slab pours
    • Test cylinders and strength control
    • Stairs and water tanks
  4. 04

    Masonry and envelope

    With the structure standing, the facades are closed and the interior partitions go up.

    • Exterior and interior masonry
    • Plastering
    • Roof waterproofing
    • Screeds
  5. 05

    Building services

    Water, drainage, power, air conditioning, fire protection and lifts: installed in coordination and tested before anything is closed up.

    • Plumbing and stormwater
    • Electrical and low-voltage
    • Air conditioning and ventilation
    • Fire protection and lifts
  6. 06

    Finishes

    What the user sees and touches: floors, wall finishes, paint, windows and doors, and fitted equipment.

    • Floors and wall finishes
    • Ceilings and paint
    • Windows, doors, glazing and railings
    • Joinery, fixtures and fittings
  7. 07

    Final details and handover

    We walk every room with a snag list, test the services and hand over the building with its documentation.

    • Snag list and touch-ups
    • Testing and commissioning
    • Final cleaning
    • As-built drawings, manuals and warranties
Video

The stages of a build, explained by Mathias Benítez, civil engineer (in Spanish)

Watch on Instagram

A project run in one system

The whole project is run in a single integrated system, from the budget to the accounts. That way you always know how much has been invested, what is left and when the work will finish.

  • Quantity take-off and budgeting
  • Cost control
  • Procurement and contracting
  • Site management
  • Administration, finance and accounting
  • Design in CAD and Revit

Do you have a project in Paraguay?

Tell us what you need to build. We reply from our office in Asunción, in English, Spanish, German or Dutch.

Schedule a meeting

Tell us what you need to build and we will set a day and time.

This site does not store your details: the message is sent from your own WhatsApp or email.