Vidalta, Bella Vista, Asunción

Construction company in Paraguay

One party responsible, from design to handover.

Vidalta · Bella Vista, Asunción · Rendering
Projects

Completed projects

See all references

S3 in figures

30,000+ m²built, across completed and ongoing projects
10projects completed or under construction
22storeys in the tallest structure we have built: Molas Design
4languages in the team: Spanish, English, German and Dutch
The stages of a build

On site

A building goes up in seven stages. Each one is checked before the next begins.

  1. 01

    Site set-up and preliminary works

    Before any earth is moved, the site is organised: hoarding, site office, temporary services and setting out the building on the plot.

    • Hoarding and site sign
    • Site office and temporary services
    • Site clearance
    • Setting out and levels
  2. 02

    Earthworks and foundations

    We excavate to design level and build the foundations specified by the soil survey.

    • Excavation and underpinning
    • Piles or pad footings
    • Pile caps and ground beams
    • Basements and waterproofing
  3. 03

    Concrete structure

    Columns, beams and slabs, floor by floor. Every pour is released only once the reinforcement is checked and the concrete tested.

    • Formwork and reinforcement
    • Slab pours
    • Test cylinders and strength control
    • Stairs and water tanks
  4. 04

    Masonry and envelope

    With the structure standing, the facades are closed and the interior partitions go up.

    • Exterior and interior masonry
    • Plastering
    • Roof waterproofing
    • Screeds
  5. 05

    Building services

    Water, drainage, power, air conditioning, fire protection and lifts: installed in coordination and tested before anything is closed up.

    • Plumbing and stormwater
    • Electrical and low-voltage
    • Air conditioning and ventilation
    • Fire protection and lifts
  6. 06

    Finishes

    What the user sees and touches: floors, wall finishes, paint, windows and doors, and fitted equipment.

    • Floors and wall finishes
    • Ceilings and paint
    • Windows, doors, glazing and railings
    • Joinery, fixtures and fittings
  7. 07

    Final details and handover

    We walk every room with a snag list, test the services and hand over the building with its documentation.

    • Snag list and touch-ups
    • Testing and commissioning
    • Final cleaning
    • As-built drawings, manuals and warranties
Video

The stages of a build, explained by Mathias Benítez, civil engineer (in Spanish)

Watch on Instagram

Do you have a project in Paraguay?

Tell us what you need to build. We reply from our office in Asunción, in English, Spanish, German or Dutch.

Schedule a meeting

Tell us what you need to build and we will set a day and time.

This site does not store your details: the message is sent from your own WhatsApp or email.