Completed projects
Under constructionApartment buildingVidalta
Bella Vista, Asunción · 10,000 m² · 2026–2028
In designApartment buildingLIVO Botánico
Loma Pytã, Asunción
Under constructionApartment buildingMidtown
Las Mercedes, Asunción · 3,460 m² · 2025–2027
CompletedAparthotelDivina Tower
Recoleta, Asunción · 2,900 m² · 2022–2024
CompletedReinforced-concrete structureMolas Design
Mburucuyá, Asunción · 8,620 m² · 2021–2023
CompletedApartment buildingGenoa Carmelitas
Carmelitas, Asunción · 2,400 m² · 2022–2023
CompletedMulti-family housingD+ America
Loma Merlo, Luque · 700 m² · 2023–2024
CompletedMulti-family housingD+ Loma Merlo
Loma Merlo, Luque · 1,000 m² · 2022- CompletedGated community
Barrio Vida San José
San José, Luque · 6,000 m² · 2022–2025
CompletedSteel-roofed warehouseGalpón GIMSA MRA
Mariano Roque Alonso · 500 m² · 2021–2022- CompletedIndustrial building
Galpón Pamaq
Fernando de la Mora · 1,152 m² · 2025–2026
S3 in figures
On site
A building goes up in seven stages. Each one is checked before the next begins.
01
Site set-up and preliminary works
Before any earth is moved, the site is organised: hoarding, site office, temporary services and setting out the building on the plot.
- Hoarding and site sign
- Site office and temporary services
- Site clearance
- Setting out and levels
02
Earthworks and foundations
We excavate to design level and build the foundations specified by the soil survey.
- Excavation and underpinning
- Piles or pad footings
- Pile caps and ground beams
- Basements and waterproofing
03
Concrete structure
Columns, beams and slabs, floor by floor. Every pour is released only once the reinforcement is checked and the concrete tested.
- Formwork and reinforcement
- Slab pours
- Test cylinders and strength control
- Stairs and water tanks
04
Masonry and envelope
With the structure standing, the facades are closed and the interior partitions go up.
- Exterior and interior masonry
- Plastering
- Roof waterproofing
- Screeds
05
Building services
Water, drainage, power, air conditioning, fire protection and lifts: installed in coordination and tested before anything is closed up.
- Plumbing and stormwater
- Electrical and low-voltage
- Air conditioning and ventilation
- Fire protection and lifts
06
Finishes
What the user sees and touches: floors, wall finishes, paint, windows and doors, and fitted equipment.
- Floors and wall finishes
- Ceilings and paint
- Windows, doors, glazing and railings
- Joinery, fixtures and fittings
07
Final details and handover
We walk every room with a snag list, test the services and hand over the building with its documentation.
- Snag list and touch-ups
- Testing and commissioning
- Final cleaning
- As-built drawings, manuals and warranties
The stages of a build, explained by Mathias Benítez, civil engineer (in Spanish)
Watch on InstagramDo you have a project in Paraguay?
Tell us what you need to build. We reply from our office in Asunción, in English, Spanish, German or Dutch.